Day 1 idea sketch · A065 · Team 3B
Check the whole system as software changes
Provide guidelines for checking the system as a whole, alongside checks of individual products, when software settings change during its life.
Workshop cluster · PRODUCT DEVT. (MANUFACTURING MGMT.)
Found in the same team stack
These source cards were filed with Team 3B’s idea sketches.
Affinity category · Software changes and manual fallback
From the same workshop cluster
Teach manufacturers about standards and environmental impacts
A047
Test material content before manufacturing
A048
Include factory and material quality in assurance
A057
Retain manual control alongside software control
A064
Test draft standards with industry and labs
A099
Include repair instructions in product standards
A117
Help firms judge the market for a certified product
A147