Research card · RA02-V02-CS01
Training AI puts new demands on the power grid.
Data centres can draw enough electricity to matter to the grid that supplies them. In 2026, a North American grid organisation asked operators to model demand, plan protection and check facilities before they start up. Some electricity organisations raised a practical difficulty. Running a full-scale test could itself disturb the grid. Training artificial intelligence is one use of these large facilities.
Discussion question
By 2050, how should IEC help data centres and electricity suppliers agree on safe ways to test large new demands for power?
Sources
- North American Electric Reliability Corporation (NERC) (2026-05-04). Essential Action to Industry: Computational Load Modeling, Studies, Instrumentation, Commissioning, Operations, Protection, and Control.
- North American Electric Reliability Corporation (NERC) (2026 (responses due 3 August; publication date not established)). Aggregated Report on the NERC Level 3 Essential Action for Computational Loads.
On the World Café tables
This conversation starter drew on desk research and was on the table at the start of the World Café.